North Valley Substation Rebuild
and Expansion Project

SDGE technician standing next to meters

Overview

This project includes construction activities at SDG&E’s existing North Valley Substation just north of College Blvd. and North River Road in the city of Oceanside. This project addresses safety, and environmental and reliability concerns within the North Valley Substation. As the regions grow, so does the need for additional energy.

The project includes:

  • Removal of overhead 12kV distribution lines and poles along North River Road
  • Undergrounding of electrical system along North River Road
  • Replacement of aging electrical equipment
  • Expansion of current substation

Del Mar Project Project Benefits

Project Benefits

  • Enhanced safety and reliability of the electric system
  • Improved electric system safety and performance during extreme weather conditions
  • Beautification of existing lot

About the Project

SDG&E will begin construction, which includes undergrounding existing 12kV overhead distribution lines, at the substation starting July 2024.

Work at this location will be performed in multiple phases:

About the project

The first phase, starting in July 2024, will include grading at the existing substation along with trenching along North River Road and College Blvd. Underground structures will be installed and multiple overhead wire spans and poles in the area will be removed. As part of the ultimate buildout, the distribution job will relocate two existing circuits and install one new 12kV circuit to meet electrical loading needs in the local area.

This phase will include the buildout of the new substation and undergrounding of transmission lines. New trees, landscaping and screening will be installed. A portion of the construction activity will take place on the street and sidewalks surrounding the SDG&E-owned property. Once construction work is finished, SDG&E will complete landscape enhancements. This will occur in Q4 2024 – 2026.

406.77 KB
PDF
North Valley Substation Rebuild and Expansion Project Fact Sheet
North Valley Substation Rebuild and Expansion Project Fact Sheet

Expect traffic delays

What to Expect

Traffic delays and temporary lane closures are expected. SDG&E plans to have traffic control measures during construction and our crews will strive to minimize impacts to you and your neighbors. Construction activities at this location may occur intermittently. Work hours, traffic control measures and noise restrictions for each area are established by local jurisdictions.

Frequently Asked Questions

This project includes construction activities at SDG&E’s existing North Valley Substation just north of College Blvd. and North River Road in the city of Oceanside.

The project includes:

  • Removal of overhead 12kV distribution lines and poles along North River Road
  • Undergrounding of electrical system along North River Road
  • Replacement of aging electrical equipment
  • Expansion of current substation

Project benefits include:

  • Enhanced safety and reliability of the electric system
  • Improved electric system safety and performance during extreme weather conditions
  • Beautification of existing lot

 

SDG&E will begin construction, which includes undergrounding existing 12kV overhead distribution lines, at the substation starting July 2024. Work at this location will be performed in multiple phases.

  • Phase 1: The first phase, starting in July 2024, will include grading at the existing substation along with trenching along North River Road and College Blvd. Underground structures will be installed and multiple overhead wire spans and poles in the area will be removed. As part of the ultimate buildout, the distribution job will relocate two existing circuits and install one new 12kV circuit to meet electrical loading needs in the local area. 
  • Phase 2: This phase will include the buildout of the new substation and undergrounding of transmission lines. New trees, landscaping and screening will be installed. A portion of the construction activity will take place on the street and sidewalks surrounding the SDG&E-owned property. Once construction work is finished, SDG&E will complete landscape enhancements. This will occur in Q4 2024 – 2026.

All work on city streets will occur from 9 a.m. – 3 p.m. Monday – Friday.

All work on SDG&E substation property will occur between 7 a.m. – 7 p.m. Monday – Friday.

This project addresses safety, and environmental and reliability concerns within the North Valley Substation. As the regions grow, so does the need for additional energy.

Traffic delays and temporary lane closures are expected. SDG&E plans to have traffic control measures during construction and our crews will strive to minimize impacts to you and your neighbors. Construction activities at this location may occur intermittently. Work hours, traffic control measures and noise restrictions for each area are established by local jurisdictions.

More Information

If you have questions, please call the Project information Line at 1-844-765-6388.